Saturday, November 19, 2016

Rain Rain...Go Away

 Nearly 14 inches of rain in the last 50 days.  That's a lot of rain and we had some wet, muddy problems near the temporary pro shop which needed correcting.
BPCI is using this path for access to the project so they're having to drive big machines through this area and the road is simply not wide enough.  We fixed that issue with a little excavation and gravel.
Inside the demolition of walls is continuing and things are getting hard to recognize.  For example this is the cart barn without a wall at the end.  This area is getting expanded so there's some serious engineering going on where there used to be a garage door.
 This area is where the restrooms and furnace used to be.
Outside the new retail area is taking shape and they're getting close to pouring some concrete.
Things are really going well and the excitement for the new pro shop is growing steadily.  Meanwhile on the golf course we finally got a break in the rain and got some things mowed down.  We even got out to punch some of the greens with the new deep tine machine.  The holes you see on these greens are 8 inches deep and almost a half inch round.  This treatment will really improve drainage.

No comments:

Post a Comment